I.
REFERENCES
A.
United States Code of Federal Regulations
B.
California Code of Regulations
C.
California Health and Safety Code
D.
UCSD Policy and Procedure Manual (PPM)
420
Building and Space
530
Facilities Management
E.
UCSD Facility Design Guidelines
II.
POLICY
All projects involving
construction, remodeling, outfitting, installation of fixtures, or any other
changes or repairs to the physical plant of UCSD owned, leased, or otherwise controlled
facilities must be reviewed by the Office of Environment, Health and Safety
(EH&S) for compliance with applicable codes, policies, and standards.
Refer to PPM 530-9, Renovations and Alterations, for
specific criteria regarding inclusion and the renovation and alteration
(R&A) process.
III.
PROCEDURES
A.
New Building Construction
All plans for new
construction will be developed by the Office of Facilities Design &
Construction (FD&C), which shall have responsibility for compliance with
policies, codes, and standards. The EH&S Office should be involved in the
project during the earliest stages in order to reduce the potential for unnecessary
expenses. FD&C will provide plans and specifications to EH&S for review
of fire, health, and safety conformance to the above referenced codes and
standards.
B.
Renovations and Alterations
1.
Projects requested on a Work Request by individual administrative units shall
comply with processes described in PPM 530-9.
2.
Plans and specifications must be approved by the UCSD Fire Marshal before
construction begins. Inspections by EH&S to verify conformance with
approved plans and specifications must be completed at previously agreed upon
intervals.
3.
Work involving areas where hazardous materials have been used shall not begin
until cleared by EH&S. See Blink Website "How to Close or
Relocate a UCSD Lab".
4.
Occupancy of remodeled spaces shall not be permitted until approval is granted
by EH&S unless waived by EH&S.
IV.
RESPONSIBILITY
A.
It shall be the responsibility of the Assistant Vice Chancellors of Facilities
Design and Construction and Auxiliary and Plant Services (A&PS) to provide
all plans to EH&S for review and to implement changes shown to be required.
B.
It shall be the responsibility of each administrative unit and individual to
make no changes to UCSD buildings without prior approval by FD&C, A&PS,
and EH&S.